The delivered pile looks like too much because compaction is real. This tool uses a 20% allowance when you leave compaction on, labelled as editorial for crushed stone, not as a lab test of your quarry.
×1.2compaction allowance, crushed stone, editorialLoose fill is not in-place depth. A patio base is not a garden path. Turn the allowance off if you are buying already-compacted material or a different spec.
Same geometry as mulch, plus compaction. Base depth is a structural decision this page cannot see. Drainage under a slab is why the DIY number is sometimes a lie. HyreYard does not sell aggregate.
Area, depth, waste, compaction
Geometry plus a labelled allowance. Nothing is emailed.
—Cubic yards
—Compaction
—Read this
What this assumed—
Geometry. The 20% compaction factor is editorial. HyreYard does not sell aggregate.
Start here
Gravel is sold by weight and used by volume
The unit mismatch is the whole problem. You calculate a hole in cubic yards. The yard sells you tons. Nobody publishes the conversion because it is not a constant — and the gap between the two is where people either run short on a Saturday or pay to haul away a pile.
Every quantity you can compute from a tape measure is a volume. Area times depth, converted to cubic yards. That is the number this calculator produces, and it is the only number the geometry can give you honestly.
Most aggregate suppliers, however, price and load by the ton, because a truck is weighed and a scale ticket is unambiguous in a way that a heaped bucket is not. So the last step of every gravel purchase is a conversion from cubic yards to tons — and that conversion is a property of the specific material, not of gravel in general.
Why there is no universal number. The tons in a cubic yard depend on the gradation (how the small stones pack into the gaps between the large ones), the parent rock (a granite and a limestone do not weigh the same), whether the stone is washed or has fines in it, and how wet the pile was when it was loaded. A screened single-size decorative stone and a dense-graded crusher run of the same nominal size are different products with different densities.
So ask, and get it in writing on the ticket. The one question that removes all of this: "how many tons per cubic yard for this specific product?" Every scale house knows the answer for the material in their own bins. It takes one phone call and it is the difference between ordering right and ordering twice. HyreYard does not sell aggregate and holds no density data, so we will not invent a figure to fill this gap — the supplier’s number for their own stone is better than any national average could be.
The second trap is the delivery minimum. Bulk aggregate is usually sold in truck loads with a minimum, and the haul is often a flat charge rather than a per-ton one. That means small jobs have a cost floor that has nothing to do with the volume you calculated, and it is frequently cheaper per unit to take slightly more in one load than to make two trips.
What one cubic yard actually covers
HyreYard arithmetic, not a source fact: 27 cubic feet divided by the depth in feet. It is the sanity check to run against whatever the calculator above told you, because a decimal point in the depth field is the most common input error on any quantity tool.
Coverage is inversely proportional to depth, so tripling the depth thirds the area. This is why "a yard of gravel" is a meaningless unit of work until somebody states the depth.
Depth
Square feet covered by 1 cubic yard
What that depth is usually for
2 in
162 sq ft
A decorative top dressing over an existing base or fabric. Not a structural layer.
3 in
108 sq ft
A path or a bed. Deep enough to stay covered when it is walked on.
4 in
81 sq ft
The ICPI published minimum compacted base for a patio or walkway on well-drained soil.
6 in
54 sq ft
The ICPI published minimum compacted base for a residential driveway on well-drained soil.
These are loose volumes, before compaction. Compaction is dealt with separately below, because the allowance is editorial and we will not fold an editorial number silently into a coverage table.
The disclosure
Why the delivered pile looks like too much
The pile is not too much. Loose delivered volume and compacted in-place volume are different quantities, and the difference is the point of the exercise — a base that has not lost volume has not been compacted, and a base that has not been compacted will settle under the thing you build on it.
Illustrative, and the allowance is editorial. The shape is the point: a fifth of the pile is not depth, it is density.
Compaction is a real, measurable, specified thing. ICPI Tech Spec 2 — Construction of Interlocking Concrete Pavements requires bases for pedestrian areas and residential driveways to be compacted to a minimum 98% of standard Proctor density, ASTM D698. For vehicular areas the requirement rises to 98% of modified Proctor density, ASTM D1557 or AASHTO T180. Those are density targets measured with a nuclear density gauge or an approved equivalent, not "run over it with the plate a few times".
It is done in lifts. The same document says to spread and compact the base in 4 to 6 in lifts using 7,000 lbf (31 kN) reversible plate compactors, and that thinner lifts are required for lighter machines. This is the single most common corner cut on a DIY base: dumping eight inches of stone and compacting the top two. The surface passes the boot test and the bottom four inches are still loose, which is exactly where the settlement comes from a year later.
Our ×1.2 allowance is editorial and we say so every time. Compaction is a real volume change and ICPI requires the base to reach 98% of standard Proctor density. The ratio between the loose volume you buy and the compacted volume you end up with depends on gradation, moisture and the compactor, and there is no published national figure for "crushed stone". Twenty percent is our planning allowance, not a measurement of your quarry.
Turn the allowance off when it does not apply. Decorative stone in a bed is not being compacted. Drainage stone wrapped in geotextile behind a wall is deliberately not being compacted to a density target, because you want the voids. A pre-compacted recycled product may already have been processed. In all of those cases the geometry alone is the answer and the multiplier is wrong.
Base thickness is published, not a matter of taste
Everything is measured here against the residential driveway minimum. Note that "wet or weak soil" moves you as far as changing from a driveway to a street does.
What is being built
Minimum compacted base
What changes it
Patio, walkway, pedestrian area
4 in
Over well-drained soils. In colder climates, continually wet or weak soils will require that bases be at least 2 to 4 in. (50 to 100 mm) thicker.
Residential driveway
6 in
Over well-drained soils. A vehicle is a different load class from a chair, and the compaction standard rises with it.
Residential street
8–10 in
Greater thicknesses are often used in regions with numerous freeze-thaw cycles, expansive soils, or very cold climates.
Any of the above on wet or weak soil
add 2–4 in
Published allowance for colder climates with continually wet or weak soils. Your soil’s drainage class is a free lookup — see below.
Read as the PDF republished by an ICPI member distributor. ICPI has since merged into the Concrete Masonry & Hardscapes Association and icpi.org redirects to masonryandhardscapes.org, so the member mirror is the copy we were able to retrieve on 5 September 2026.
The stone matters as much as the depth
Two piles of grey rock that look identical from ten feet away can behave completely differently under load and under water. The distinction that matters is whether the material is dense-graded or open-graded — that is, whether it is designed to lock up or to drain.
Dense-graded: designed to lock
A spread of particle sizes from coarse down to fines, so the small particles fill the voids between the large ones. Under a compactor it interlocks and becomes something close to a solid. This is what a compacted base is made of, and it is why base stone is not the same product as drainage stone.
The trade-off is that having filled the voids, it does not drain freely. Water moves through it slowly, which is fine under a surface that sheds water and a problem where you needed the stone to carry water away.
Open-graded: designed to drain
A narrow band of sizes with the fines washed out, so the voids stay open. Water moves through it very fast. This is what goes behind a retaining wall, around a perforated pipe, and in a dry well.
It will never compact to a dense-graded density, and it is not supposed to. Specifying open-graded stone as a patio base, or dense-graded stone as wall backfill, are the same mistake in opposite directions and both of them fail.
Bedding sand is a third thing again
ICPI Tech Spec 2 — Construction of Interlocking Concrete Pavements is explicit: bedding sand under concrete pavers should conform to ASTM C33 or CSA A23.1 FA1 concrete sand, screeded to an uncompacted nominal 1 in.
And the prohibition is just as explicit: "Masonry sand for mortar should never be used for bedding, nor should limestone screenings or stone dust." That last item — stone dust, sometimes sold as screenings or quarry dust — is what a lot of homeowners reach for because it screeds beautifully and looks like the right thing. It holds water and it is named in the standard as what not to use.
Decorative stone is a finish, not a structure
Rounded river rock, pea gravel and the coloured landscape stones are surface materials. Rounded particles cannot interlock — they roll — so they never form a stable walking surface and they migrate out of any area that is not edged.
They are also the materials most often laid on top of landscape fabric, which works for about three years until organic debris builds a soil layer on top of the fabric and weeds root in that instead. The fabric is then permanently in the way of fixing it.
The order the work goes in
Five of these seven steps happen before any stone is bought, which is roughly the inverse of how much attention each gets.
1
Call 811 before you dig
Free, legally protected in every state, and takes a few working days. A utility locate is the cheapest step in the whole project and the only one with a criminal downside if skipped. This is not optional advice.
2
Find out what your soil is
USDA NRCS Web Soil Survey gives you the mapped soil at your address, its drainage class and its hydrologic soil group, free, in about five minutes. Whether you are on a Group A sand or a Group D clay changes the base thickness before it changes anything else.
3
Settle the finished level, then work down
The finished surface has to shed water away from the house and meet the doorway, the lawn and the driveway at the right heights. Everything below it is subtraction. Excavating first and hoping the levels work out is how patios end up ponding against a wall.
4
Excavate to full depth across the whole area
Full base depth plus bedding plus the paver or surface thickness. The most common failure is excavating deep in the middle and shallow at the edges, because the edge is where the load concentrates and the edge is where it fails.
5
Compact the subgrade before any stone goes in
ICPI Tech Spec 2 — Construction of Interlocking Concrete Pavements calls compaction of the soil subgrade critical to performance. Stone compacted on top of a soft subgrade transmits the softness upward; it does not cure it.
6
Build the base in lifts and compact each one
4–6 in lifts, thinner for lighter machines. Check the depth with a tape at several points after each pass rather than by eye. Frozen material should not be compacted at all.
7
Then bed and lay
Screed the bedding sand to an uncompacted nominal inch and do not use it to correct an uneven base — the unevenness will telegraph through to the surface within a year or two.
What to ask the supplier, and what a good ticket shows
The highest-value section on this page. Four questions, asked before the truck is loaded, remove almost every way a gravel order goes wrong.
Tons per cubic yard, for this specific product
Not for "gravel". For the exact bin you are buying from. Every scale house knows it. This is the conversion that turns your volume calculation into an order, and it is the one figure nobody publishes.
Is it dense-graded or open-graded, and what is it specified as?
Ask for the product designation the yard uses, then write that designation into any quote you collect. "Gravel" on a contractor’s bid is not a specification and cannot be compared between bids.
What is the delivery minimum and how is haul charged?
Flat per load or per ton makes a large difference on a small job, and the minimum load may exceed the volume you need. Knowing this before you calculate lets you size the job to the truck rather than the other way round.
Where exactly will it be tipped, and can the truck get there?
A pile in the wrong place is a second handling by wheelbarrow, which on a driveway-sized order is a full day of work. Overhead wires, soft lawn, low branches and a gate width are all things to establish on the phone, not on the day.
A ticket that says only "load of gravel"
You cannot check the weight, the product or the price against anything. Ask for the scale ticket with the product designation and the net weight on it. Keep it — if the base is later disputed, that ticket is the only evidence of what went in.
A contractor who will not state the compacted base depth in the quote
Base depth is the single largest hidden cost in hardscaping and the easiest place to win a bid by omission. A quote that says "prepare base" and no number is not comparable with one that says six inches compacted in two lifts.
Gravel is not a drainage solution by itself
A very common and expensive misunderstanding: putting stone where water collects does not remove the water. It gives the water somewhere to sit that you can no longer see.
Stone stores water; it does not transport it. An open-graded stone is roughly a third voids, so a cubic yard holds meaningful water — but it only moves if there is somewhere for it to go, downhill, with an outlet. A gravel trench with no outlet is a buried bathtub. It will hold water for a while, then fill, then the surface will be wet again and you will have spent the money.
The outlet is the design. Where does the water leave? Daylight on a slope, a storm connection where one is permitted, a dry well sized to the soil’s infiltration rate. If none of those exists, no amount of stone changes the outcome, and the correct first move is grading and downspout extension rather than excavation.
And the surface you build may be the cause. The EPA notes that in developed areas "much of the land surface is covered by buildings, pavement and compacted landscapes. These surfaces do not allow rain and snow melt to soak into the ground which greatly increases the volume and velocity of stormwater runoff". A new patio is a new impervious surface. The water that used to soak in where it fell now arrives somewhere else, at a higher rate, and where it arrives is a design decision you are making whether or not you think about it. The EPA page states the mechanism and does not publish a runoff percentage. We do not publish one either.
Which is why the soil lookup comes first. The NRCS hydrologic soil groups are a direct statement about how much of the rain will run off rather than soak in. Group A is deep sand and takes water readily; Group D is high-shrink-swell clay, a claypan or shallow soil over rock and sheds nearly all of it. Building the same detail on both is how one of them fails.
The vocabulary, so a quote can be read
The words below are used loosely in yard work, and the looseness is usually in the direction of the person selling.
Subgrade
The native soil under everything you build. Its condition sets what the base has to do. Compacting the base on a soft subgrade transmits the softness upward rather than curing it.
Base (or sub-base)
The compacted aggregate layer that spreads load. Thickness is published as a minimum by use and soil, and it is the line most often absent from a quote.
Lift
One layer of base placed and compacted before the next goes on. Compacting eight inches in one pass compacts the top two.
Proctor density
A laboratory reference for how dense a given soil or aggregate can be made at optimum moisture. Field compaction is expressed as a percentage of it. Standard (ASTM D698) and modified (ASTM D1557) are different references and are not interchangeable.
Dense-graded
A spread of sizes down to fines, designed to interlock under compaction. Base material. Drains slowly by design.
Open-graded
A narrow band of sizes with the fines washed out, designed to keep its voids. Drainage material. Never reaches base density and is not supposed to.
Crusher run / dense-graded aggregate
Regional names for dense-graded base products. The names differ by region and by quarry, which is why the product designation on the ticket matters more than the name.
Geotextile separation fabric
A fabric between subgrade and base that stops fine soil pumping up into the stone and destroying its gradation. Not the same product as the woven weed fabric sold in garden centres.
Edge restraint
The thing that stops the whole assembly spreading sideways. ICPI Tech Spec 2 — Construction of Interlocking Concrete Pavements calls for at least 1 in of vertical restraining surface in contact with the paver.
Scale ticket
The weighed record of what was actually delivered: product designation, net weight, date. The only durable evidence of what went into your base.
What this calculator cannot do
Real blind spots, not a disclaimer. Each of these is a case where the arithmetic is right and the answer is still wrong.
It cannot convert your volume to tons. That conversion is a property of the specific stone in the specific bin, and we hold no density data. The supplier does. This is the one number you have to get from somebody else.
It cannot choose your base depth. Depth follows load, soil and climate. We publish the ICPI minimums above so you have a defensible floor to type into the field, but the tool takes whatever you type and does not know what you are building or what you are building it on.
It cannot see your soil. The published minimums assume well-drained soils. On wet or weak ground the same document adds 2–4 in. Whether you are on such a soil is a free lookup we point you at and cannot do for you.
It cannot know your frost depth. Frost heave is a local design condition, set by your jurisdiction, and it changes what a durable assembly looks like in ways a volume calculator has no access to.
It is not a structural design. Anything retaining soil, carrying a vehicle beyond a domestic driveway, or supporting a structure is engineering. A number of cubic yards is not a design and must not be treated as one.
And it is not a quote. HyreYard does not sell aggregate, does not deliver it, does not install it and takes no payment from anyone who does. Figures verified 5 September 2026.
Questions this calculator answers
How much gravel do I need?
Square feet times depth in feet, divided by 27, plus waste, plus compaction if the stone will be packed. That last term is why a pile disappears.
How deep should a gravel base be?
It depends on the load. A patio is not a walkway. This tool will not invent a depth; you type it.