Seats times a planning allowance, default 25 sq ft each, plus 40 sq ft if you want a grill pad. That is furniture clearance, not a compacted base, not a slope, and not a permit. When you have an area, the paver calculator puts waste and base on the page. HyreYard does not pour patios.
25 sq ftper seat, editorial, defaultEight seats at 25 sq ft, plus a grill pad, is 240 sq ft of planning area. Raise the allowance if you want circulation behind chairs. This is not a slab specification.
On a worked example of 8 seats at the default 25 sq ft each, with a grill pad, the plan is 8 seats at 25 sf and the planning area is 240 sq ft (200 plus 40). Four seats, no grill, is 100 sq ft. Six seats at 30 sf with a grill is 220 sq ft. Use that area in the paver calculator for waste and base. This is an editorial envelope, not a structural spec. HyreYard does not pour patios.
Seats, grill, square feet per seat
Editorial envelopes. Not a slab spec. Nothing is emailed.
—Plan
—Planning area
—Extras
What this assumed—
Editorial square feet per seat, optional grill pad. Not a structural slab spec. HyreYard does not pour patios.
A patio has to be deliberately not level
The instruction almost every homeowner gives — make it nice and flat — is, taken literally, an instruction to build a shallow basin. The published guidance for interlocking concrete pavement puts a floor under the slope for exactly this reason.
Why the number is a minimum rather than a target. Surfaces are not laid perfectly. Bedding compacts unevenly, a paver settles a millimetre, a base has a soft spot. A patio built at exactly the minimum in theory will have local areas below it in practice, and those are where water stands. Building at the minimum is building with no tolerance for the ordinary imprecision of construction.
And what standing water actually does. It is not primarily a cosmetic problem. Water that sits works into the joints, moves the jointing sand, and in a freezing climate goes through freeze-thaw cycles right at the surface — which is the mechanism that spalls concrete and lifts pavers. A puddle in October is a displacement in March. The same water, if it reaches the bedding and sits in the base, softens the thing the whole patio is standing on.
Now the direction of the slope, which nobody asks about and everybody should. The fall has to go somewhere, and the somewhere is a decision. Away from the house is the obvious first answer and it is usually right. But away from the house on a patio that abuts a lawn on a clay soil simply relocates the problem to the lawn, and away from the house toward a boundary relocates it to a neighbour. The question "where does the water go once it leaves the patio" is the one that separates a patio that works from one that produces a soft, permanently wet strip along one edge.
Because the patio is a new impervious surface. US Environmental Protection Agency describes the mechanism plainly: "much of the land surface is covered by buildings, pavement and compacted landscapes. These surfaces do not allow rain and snow melt to soak into the ground which greatly increases the volume and velocity of stormwater runoff" The EPA page states the mechanism and does not publish a runoff percentage. We do not publish one either. Every square foot of patio is a square foot of ground that used to absorb rain and now sheds it. On a small lot, several hundred square feet of new hard surface is a material change to how the whole garden handles a storm.
Which is why this page starts with slope rather than with size. The tool above answers "how big", using an editorial allowance we label as editorial. It is a useful question and it is not the one that determines whether you are happy in five years.
The square feet per seat is our judgement, and here is what it is made of
There is no published standard for how much patio a person needs. We looked, and we are not going to invent one. What follows is our reasoning, offered so you can disagree with it intelligently.
Start with what the number has to cover. The chair itself. The space the chair occupies when it is pushed back to sit down or stand up, which is more than the chair. A share of the table. And enough room behind the pushed-back chair for somebody to walk past without a performance. Those four together, not the footprint of a seated person.
The default of twenty-five square feet a seat is our planning allowance. It is editorial. It is not a code figure, not a trade standard, and not a measurement we made — it is a round number that in our judgement covers those four things for ordinary dining furniture, and the tool lets you change it because your furniture is not ordinary and your circulation is not ours.
When to raise it, and by how much you should think. Lounge furniture is substantially deeper than dining furniture and wants materially more. A patio with a route across it — to a gate, a shed, a lawn — needs that route in addition to the seating, not through it. A second conversation cluster is a second envelope, not a bigger one. And a patio against a wall on two sides behaves differently from a patio in the open, because chairs on the wall side have nowhere to go.
When to lower it. Bench seating along a fixed edge, built-in seating, or a small bistro arrangement all use less. If you genuinely know your furniture, measuring it is better than any allowance including ours — put the actual pieces on the lawn with the chairs pushed back and a tape around the lot of it. Twenty minutes, and it beats every rule of thumb on the internet.
And the grill pad, which is the same kind of judgement. The forty square feet the tool adds is an allowance for a portable grill and standing room in front of it. A built-in island with a side burner, a smoker and worktop is a different object entirely and the allowance does not describe it. Raise the area, or plan the outdoor kitchen as its own zone.
Why we are labouring the point that this is editorial. Because the same number appears on a great many websites presented as though it came from somewhere. It did not come from anywhere. It is a reasonable planning convention, and a reader is entitled to know which numbers on a page are measurements and which are somebody’s opinion. On this page: the slope, the base depths and the bedding are published figures with a source. The seats allowance is ours.
The published base depths, and what changes them
Almost every patio failure is a base failure. These are the published minimums for interlocking concrete pavement, and the last column is the part people leave out.
Note the shape: the load, not the finish, drives the depth. The same paver on the same bedding needs half again as much base under a car as under a chair, which is why "we can drive on it" is a specification change and not a favour.Interlocking Concrete Pavement Institute, ICPI Tech Spec 2 — Construction of Interlocking Concrete Pavements. Retrieved 2026-09-05.
Use
Published base thickness (in)
What the figure assumes
Patio, walkway, pedestrian area
4
Well-drained soils. The floor, not a target.
Residential driveway
6
Well-drained soils. A car is a different load from a chair.
Four layers, each with a published figure attached, and each with a characteristic way of being got wrong. These are the lines a bid should carry and usually does not.
The subgrade, and the compaction figure
The published requirement is 98 per cent of standard Proctor density, ASTM D698 for the soil subgrade. That is not "we ran a plate over it". It is a density target, measured against a laboratory reference, and it is the reason a proper job takes longer than an improper one.
And compaction happens in lifts. The published guidance calls for lifts of 4 to 6 inches, compacted with 7,000 lbf (31 kN) reversible plate compactors. A base dumped in one deep layer and rolled on top is compacted at the top and loose underneath, and it will settle exactly the way you would expect.
Vehicular areas are tested differently again — against modified Proctor density, ASTM D1557 or AASHTO T180. Different reference, different number, and it is another reason a driveway is not a patio with more stone.
Our compaction allowance, labelled as ours. The gravel tool on this site applies a factor of 1.2 — about 20 per cent — to loose delivered volume. Compaction is a real volume change and ICPI requires the base to reach 98% of standard Proctor density. The ratio between the loose volume you buy and the compacted volume you end up with depends on gradation, moisture and the compactor, and there is no published national figure for "crushed stone". Twenty percent is our planning allowance, not a measurement of your quarry.
The bedding layer, which is not a levelling layer
The thickness. "Bedding sand should be spread and screeded to an uncompacted nominal 1 in. (25 mm) thickness." A nominal 1 inch, uncompacted. Not two inches, not "however much it takes".
And the sentence that explains why. "If there is an uneven base, the bedding sand should not be used to compensate for it. Over time, unevenness in the bedding sand will reflect through to the surface." This is the single most useful line in the whole document for a homeowner watching a job. If the base is uneven and somebody is fixing it with extra sand, the unevenness has not gone away — it has been buried, and it will come back through the surface as the sand under the thick spots consolidates more than the sand under the thin ones.
The material is specified too. ASTM C33 or CSA A23.1 FA1 concrete sand. And explicitly excluded: "Masonry sand for mortar should never be used for bedding, nor should limestone screenings or stone dust." Those are common substitutions, they are cheaper, and they are named as wrong in the published guidance.
And a weather rule. "Frozen or saturated sand should not be installed, and frozen material should not be compacted." Which, like the equivalent rule for footings, is a reason to ask about timing rather than to assume winter work is fine because the crew is free.
The edge restraint, which is the whole reason it stays a patio
The requirement. "A minimum of 1 in. (25 mm) vertical restraining surface should be in contact with the side of the paver to adequately restrain it." A minimum 1 inch of vertical surface actually in contact with the side of the paver.
Why it is not a trim detail. Interlocking concrete pavement works by interlock — the units transfer load to their neighbours, and the whole field acts together. That only holds while the perimeter cannot move. Lose the edge restraint and the outer course creeps outward, the joints open, the sand escapes, and the failure propagates inward from the edge. Every patio you have seen with a wandering, gappy border failed here.
Which makes it the first thing to look at on any patio you are shown as an example of somebody’s work. Not the colour of the stone. The edge, three or four winters in.
Cold climates, weak soils, wet soils
The published adjustment. "In colder climates, continually wet or weak soils will require that bases be at least 2 to 4 in. (50 to 100 mm) thicker." So an extra 2 to 4 inches on top of the base figures in the table above, where the soil is continually wet or weak and the climate is cold.
And on streets specifically: "Greater thicknesses are often used in regions with numerous freeze-thaw cycles, expansive soils, or very cold climates."
Notice what triggers the increase: the soil and the climate, not the paver. Which is why two identical patios, same product, same crew, are two different specifications in two different places — and why a national base depth quoted without the soil and climate conditions attached is not usable information.
Both of which you can look up before you buy anything. Web Soil Survey, USDA Natural Resources Conservation Service, gives the mapped drainage class and hydrologic soil group for your parcel. A parcel-level lookup of the mapped soil, its drainage class, its hydrologic soil group and its shrink-swell potential. It is free, it takes about five minutes, and it is the cheapest useful thing a homeowner can do before buying hardscape. It is a survey map, not a site investigation of your lot.
Where the water goes after it leaves the patio
The slope gets water off the surface. That is half of a drainage design and it is the half everyone stops at.
Follow the water past the edge. One and a half per cent across a substantial patio delivers a meaningful volume to one strip of ground, concentrated at the low edge, every time it rains. That strip did not previously receive the rain that fell on the patio footprint; now it receives all of it. If that strip is a lawn on a free-draining soil, nothing much happens. If it is a lawn on a heavy clay, you have created a permanently soft area, and you have created it deliberately without meaning to.
The soil groups are the vocabulary for this. "A" is low runoff: Deep sands and gravelly sands. Water goes down. "B" is moderately low: Moderately well to well drained, moderate texture. "C" is moderately high: A layer that impedes downward movement, or finer texture. "D" is high runoff: Clays with high shrink-swell, a high water table, a claypan, or shallow soil over near-impervious material.
On a Group D soil, "it will soak away" is not a plan. It is a hope about a soil that has been classified specifically as the one where that does not happen. This is knowable free, in five minutes, for your parcel, before you spend anything — and it is the single most useful thing a homeowner can do before buying hardscape.
Then check the direction against the house. Water must not be delivered toward a foundation, and a patio that abuts the house is a large surface immediately adjacent to one. This is basic and it still goes wrong, usually because a patio was extended later and the new fall was matched to the old surface rather than to the ground.
And check what your neighbour receives. Concentrating runoff onto adjoining land is capable of being a legal problem as well as a social one, and the rules vary by state. We are not going to summarise them, because we have not retrieved them and a confident national statement here would be exactly the kind of thing this site exists not to publish. What we will say is that it is worth finding out before you build rather than after.
The honest options, in rough order of cost. Reduce the patio so there is less surface to shed. Split the fall so no single edge takes all of it. Put a gravel infiltration strip or a planted bed along the low edge to spread and slow it. Or, where the soil genuinely will not take it, a proper drain to a proper outfall — which is a designed thing with an engineered destination, not a length of perforated pipe buried optimistically.
A patio usually needs no permit, and that answers less than you think
The exemption is real, it is narrow, and the sentence after it does a lot of work.
The model administrative list, Texas Windstorm Insurance Association Building Code, 2024, section 105.2, read on 5 September 2026, exempts: "Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route."
Read the qualifiers. Not more than thirty inches above adjacent grade, not over a basement or storey below, and not part of an accessible route. A patio built up on fill to level a sloping garden can exceed the height qualifier without anybody noticing, and at that point it is not exempt and it may be a structure with a guardrail requirement.
And where a patio meets a retaining wall. "Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or IIIA liquids." Notice that the retaining wall figure is measured from the BOTTOM OF THE FOOTING, not from the ground you are standing on. A wall that shows three and a half feet of face can easily be over four feet by the code’s own measurement, and the person who built it to the visible height has measured the wrong thing.
Then the closing sentence. "Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction." This is the sentence people skip and it is the whole point. Not needing a permit is not permission to build it wrong, and it is not permission at all under zoning, a deed restriction, a homeowners association covenant, or an easement. Those are separate instruments with separate consequences, and none of them is waived by a building-permit exemption.
Which for a patio means these separate questions remain open. Lot coverage and impervious surface limits, which many jurisdictions now apply specifically because of the runoff mechanism described above. Setbacks from boundaries. A homeowners association covenant about materials. Recorded easements, which are the reason a patio can be lawful in one part of a garden and prohibited in a strip across it. And in some places a stormwater rule that treats new impervious area as a thing to be managed on site.
None of those is answered by "you do not need a permit for that". All of them are answerable in the same phone call, if you ask them as separate questions rather than as one.
What a patio bid should say, and what to ask when it does not
A patio bid competes on stone because stone is what you can see. These seven are what you cannot.
Base thickness in inches, and what it assumes about the soil
The published minimum for a pedestrian patio is 4 inches on well-drained soils, with more for cold climates and wet or weak ground. A bid that names a depth has made a decision; one that says "proper base" has not.
How the base will be compacted, and in what lifts
Lifts of 4 to 6 inches, and a density target for the subgrade rather than a number of passes. This is the answer that most reliably separates a crew that knows the document from one that does not.
Bedding material and thickness, named
A nominal 1 inch of the specified concrete sand. Then ask directly whether bedding will be used to make up for base unevenness, because the published guidance says it must not be.
The slope, stated as a percentage and a direction
The published minimum is 1.5 per cent. Ask for the figure and for where the water is being sent — then walk to that place and look at it.
The edge restraint, as its own line
What it is, and that at least 1 inch of vertical surface will bear against the side of the paver. This is the component whose failure produces the wandering border you have seen on every failed patio.
Look your parcel up on Web Soil Survey before you read any bid
Free, five minutes, and it gives the drainage class and hydrologic soil group. If it comes back as a high-runoff group, you now know to be sceptical of any plan that assumes the water will soak away, and you know it before you have spent anything.
Ask the building department three separate questions, not one
Whether a permit is needed for this specific patio; whether there is a lot coverage or impervious surface limit; and what the setback is. Three questions, three answers. The first does not contain the other two.
The words on a patio bid
Subgrade
The existing soil the whole thing stands on, after excavation. Its compaction is specified — 98 per cent of standard Proctor density, ASTM D698 — because everything above it inherits its behaviour.
Base (or sub-base)
The compacted aggregate layer between subgrade and bedding. It is the structural element. Depth is driven by load, soil and climate, not by the paver on top.
Bedding
A nominal 1 inch, uncompacted, of specified concrete sand. It is a setting layer, not a levelling layer, and the published guidance says so explicitly.
Edge restraint
The perimeter element that stops the outer course moving outward. Needs at least 1 inch of vertical surface in contact with the paver. Without it the interlock progressively fails from the edge inward.
Interlock
The mechanism by which individual units share load with their neighbours so the field behaves as a surface rather than as loose stones. It depends on tight joints, filled joints, and a perimeter that cannot move.
Lift
A single layer of base placed and compacted before the next goes on. Published at 4 to 6 inches. The concept exists because compaction energy does not reach far down.
Proctor density
A laboratory reference for how dense a soil can be made at optimum moisture. Field compaction is specified as a percentage of it. Standard (standard Proctor density, ASTM D698) and modified (modified Proctor density, ASTM D1557 or AASHTO T180) are different references and different numbers.
Impervious surface
Ground that does not let rain soak in. A patio is one. Many jurisdictions cap the total on a lot, and the cap is a zoning or stormwater matter rather than a building-permit one.
Hydrologic soil group
Four classes describing how readily water enters soil, A through D. Free, per parcel, on Web Soil Survey, and directly relevant to whether runoff from a patio has anywhere to go.
What this planner cannot do
Six blind spots, stated specifically rather than as a disclaimer.
The area it produces is an editorial envelope, not a design. Square feet per seat is our planning allowance and we say so on this page every time it comes up. It is not a published standard and there is no published standard we found to offer instead. Measuring your actual furniture beats it.
It cannot lay out a shape. A hundred and fifty square feet as a long thin strip and as a square are the same number and two entirely different patios. Area does not contain proportion, and proportion is most of whether the space works.
It cannot see your grade. Whether you can achieve the minimum fall without a step, a wall or a large amount of excavation is the question that most often changes a patio project, and it is answered by standing on the ground with a level.
It publishes no prices and holds no dataset of them. Not for pavers, not for base, not for labour. We do not lay patios, sell aggregate, rank contractors or take a referral fee from anyone who does. When you have an area, the paver calculator on this site turns it into quantities — quantities are arithmetic, prices are not.
The base and bedding figures are one published document. Read as the PDF republished by an ICPI member distributor. ICPI has since merged into the Concrete Masonry & Hardscapes Association and icpi.org redirects to masonryandhardscapes.org, so the member mirror is the copy we were able to retrieve on 5 September 2026. They are minimums for stated conditions, they are not a specification for your lot, and an engineer or an experienced installer looking at your actual soil may reasonably specify more.
And the code material is model-code material. That state adoption carries an exception for freestanding accessory structures at or below 721 square feet, and a further exception for decks not supported by a dwelling. Both the threshold and the wording are that state’s own — other adoptions we saw referenced in the same search used different areas and different construction types. Treat the existence of an exception as normal and its numbers as strictly local. Adoption and amendment are local, and the figures that bind you are the ones your jurisdiction publishes.
When the honest answer is a smaller patio
Almost every patio sizing guide is published by somebody who is paid by the square foot. This one is not.
Name the conflict. Hardscape guidance is overwhelmingly produced by installers, paver manufacturers and marketplaces taking a fee on the introduction. All of them have the same structural incentive on this specific question, and it points one way. HyreYard does not pour patios, sell stone, rank installers or take a referral fee from anyone who does — which is what allows this section to exist.
Three reasons a smaller patio is often the better one. First, cost scales with area and it scales in the base as well as the surface, so the saving on a smaller patio is larger than the surface area suggests. Second, every extra square foot is extra impervious surface producing extra runoff that has to go somewhere on a lot that is not getting bigger. Third — and this is the one people report afterwards — an oversized patio reads as empty rather than as generous, and the furniture ends up clustered in one corner of it anyway.
The test that costs nothing. Mark the outline on the lawn with a hose or with marker paint, put the actual furniture inside it, and live with it for a week. Sit in it in the evening. Walk the route to the gate. You will adjust the shape, and you will almost certainly adjust it downward. Doing that before a bid is free; doing it after the stone is down is not possible.
And the sequencing point this whole page is really about. Fix the water and the grade before you pave. Retrofitting drainage under a finished patio means lifting the finished patio, and at that point you are paying twice for the same square feet. The order is grade, drainage, base, then stone — and the tool above only speaks to the last of those.
How this calculator works
The calculator multiplies seats by a planning allowance, then optionally adds a grill pad:
area = seats x sq ft per seat
area = area + 40 if grill pad is yes
per = at least 20 (the engine floors anything lower)
Default square feet per seat is 25. That number is editorial: a chair, a share of a table, a little walk-behind. It is not a furniture-industry survey we are reproducing, and it is not a structural thickness. If you type 15, the engine still uses 20. If you want generous circulation, type 30 or 35.
The 40 sq ft grill pad is the same kind of envelope: enough for a typical grill and a person standing at it, not an outdoor kitchen, not a gas line, not a hood. Built-ins want a drawing.
HyreYard does not pour patios, does not lay pavers, and does not specify slabs.
What each input means
Inputs on this tool, in the order they appear on the form.
Input
What it is actually asking
Seats
How many people should sit at once on an ordinary evening, not the once-a-year overflow. 0 asks you to enter a number.
Grill pad
Yes adds 40 sq ft. No leaves seating only. An island, a smoker and a side burner are not 40 sq ft. Raise the area if you already know you want more.
Sq ft per seat
Editorial planning allowance. Default 25. Minimum 20 in the engine. Raise it for lounges, a path behind chairs, or a second conversation cluster.
Worked examples
Including one where the naive answer misleads, which is the example most calculators leave out.
Eight seats and a grill, default envelope
Seats 8, grill yes, 25 sf each. Plan: 8 seats at 25 sf each. Extra: grill pad +40 sf. Planning area 240 sq ft. That is the arithmetic this engine is tested against. Take 240 to the paver calculator. Do not pour 240 as a level slab against the house without a slope and an edge.
A four-top, seating only
Seats 4, grill no, 25 sf each. Plan: 4 seats at 25 sf each. Extra: seating only. Planning area 100 sq ft. Tight for a lounge. Fine for a bistro table if you do not need to walk behind every chair. If you do, raise the allowance.
The one where 25 sf per seat misleads as a spec
A page that says "patio size calculator: 25 sq ft per person, pour this." Eight seats becomes a 200 sq ft slab, no slope, no base, no edge, no place for the grill hose, under a downspout. The envelope was a furniture guess. The patio is a system: subgrade, compacted aggregate, bedding, pavers or concrete, edge restraint, joints, and a fall away from the house. ICPI publishes that system for interlocking concrete. This tool stops at the envelope on purpose. Using 25 as a structural spec is the failure mode.
What changes the result
Seats and the per-seat allowance move area linearly. The grill pad does not: it is a flat 40 sq ft. Doubling seats from 4 to 8 doubles the seating rectangle. It does not double a built-in kitchen.
Circulation is the quiet need. Chairs pull out. Someone walks behind. A 25 sf envelope starts to feel tight at 8 seats if the table is wide. Raise the allowance rather than lying to yourself about how you use the space.
Trees, doors, downspouts and a property line cut the rectangle you think you have. Walk the lot. A planning area that only exists on this page will lose a corner to a trunk or a setback.
Local considerations
Frost, slope, drainage rules and whether a patio at grade needs a permit are local. A number of square feet is not. We do not ship a city table of patio sizes, and we do not ship a national $/sf for pouring one.
If the patio replaces irrigated turf, your water utility may or may not count that area in a turf rebate. Hardscape often does not qualify, or qualifies only up to a share of the conversion. Check the current program. Do not assume 240 sq ft of stone is 240 sq ft of rebate.
When not to use this
Do not use this as a slab specification, a paver order, or a structural drawing. It cannot see load, frost, slope or a tree.
Do not use it as a permit determination. At-grade patios often do not need one; roofs, grade changes and HOAs often do. Ask.
Do not use 25 sq ft per seat as a building code. It is labelled editorial because that is what it is.
Do not skip the paver calculator if you are ordering stone. Waste, base and edge restraint are why a pile of pavers on the lawn is not a patio.
HyreYard does not pour patios. Matching is still being built. The enquiry form is not a dispatch line.
Related on this site
Hardscaping as a tradeAlmost all patio failures are base failures: depth, compaction, drainage, edge.
Large enough for the furniture you will actually use, plus room to walk behind it, plus any grill or outdoor kitchen you are not willing to skip. This page uses 25 sq ft per seat as a planning default you can raise. It is not a building code. A 4-top with a grill is a different patio from a 12-person table.
Where does 25 sq ft per seat come from?
It is an editorial envelope on this form, not a surveyed furniture standard and not a structural number. It is meant to be enough for a chair, a share of a table, and a little circulation. If you want a lounge or a path behind every chair, type 30 or more. The engine will not go below 20.
Does this include the grill?
Only if you switch the grill pad on. That adds 40 sq ft as a flat editorial pad, not a measured outdoor kitchen. A built-in island wants more, and it wants clearance from the house and from the seating. Type a larger area or raise seats. Do not treat +40 as a gas, electrical and hood design.
Is this the slab I should pour?
No. This is a planning area. A slab or a paver patio still needs slope to drain, a base, an edge, and a joint layout. The paver calculator takes the area next and adds waste and base volume. ICPI treats base, bedding, edge restraint and slope as the system. None of that is in 25 sq ft per seat.
Do I need a permit for a patio?
Often not for a patio at grade, and often yes if you are changing drainage, building a roof over it, or attaching a structure. This varies by jurisdiction and HOA. A call to the building department settles it. This form will not.
What about a fire pit or a hot tub?
Not on this form. Both have clearance, weight and, for spas, electrical and structural questions this envelope cannot see. Add area by raising the square feet per seat, or plan them as a separate pad. Do not bury a spa in +40 grill.
Should the patio sit against the house?
Only if the grade already drains away, the flashing and door threshold can take it, and you want that connection. A patio that ponds against a sliding door is a drainage job. Walk the lot in rain before you lock an area.
Round or rectangular?
This tool returns a single area. Shape is a later drawing. Curves waste more paver. Rectangles are easier to edge. Neither is decided here.
How do I go from this number to a material order?
Take the planning area to the paver calculator for waste and base, or to the gravel calculator if you already have a specified depth. Then price the dollars in the landscaping cost estimator. Size, then quantity, then money. Skipping to a $/sf patio average hides the base.
Is this a quote?
No. It is furniture geometry with a labelled allowance. It cannot see slope, frost, a tree you must work around, or a setback. HyreYard does not pour patios.
Does HyreYard build patios?
No. HyreYard is an information and matching layer. Matching is still being built. The enquiry form is not a dispatch line.
Sources and methodology
Figures dated 26 August 2026. Last reviewed .
Interlocking concrete pavement as a system (Interlocking Concrete Pavement Institute / CMHA, retrieved 2026-08-26. Cited for base, bedding, edge restraint and slope as the patio, not for a seats-to-area table. The 25 sq ft envelope is editorial on this page and is labelled as such.)
Hiring a contractor (Federal Trade Commission, retrieved 2026-08-26. Written estimates. A patio bid should state area, base depth, compaction and edge, not only a colour of stone.)
Soak Up the Rain (U.S. Environmental Protection Agency, retrieved 2026-08-26. Where rain goes after it hits a patio is a drainage question. Area without slope is a pond.)
Related
Patios and walkwaysOnce the area is settled, the four layers underneath are what decide whether it lasts.
Paver calculatorTake this area next: waste, base volume, and the edge the two numbers skip.